Decorating in Barnet: Fresh Plaster, Old Woodwork, Damp Marks
Fix Your House provides painting and decorating for homes in Barnet and the surrounding EN5, EN4 and N20 streets. We prepare surfaces before anything else happens, filling, sanding, sealing and making good, then paint or paper, because most of the decorating problems people describe to us turn out to be preparation problems.
Almost every decorating problem people describe to us turns out to be a preparation problem. The paint is rarely at fault. What is at fault is what it went onto, and how long ago.
Three situations cover most of the calls from Barnet houses: a room that has just been plastered, woodwork that has been painted over so many times the detail has gone, and a mark that keeps coming back through the emulsion.
How long does new plaster need before it is painted?
Until the whole wall has gone evenly pale, with no darker patches anywhere on it.
Plaster dries from the surface inwards and the darker areas are the wet ones. In a heated room a thin skim is usually there in a couple of weeks; hacked-off and rebuilt areas are much thicker and take considerably longer, which is why one wall in a room can be ready while the wall opposite is not.
Painting it early does not just look wrong now. The film traps the remaining moisture, which then either lifts the paint or pushes salts through it, and the wall has to be stripped back and started again.
Why does the first coat look patchy?
Because new plaster is porous and pulls the water out of ordinary emulsion unevenly, so the pigment sits where it lands rather than levelling.
The answer is a mist coat: emulsion thinned with water, brushed and rolled on so it soaks into the surface and seals it. It looks thin and unconvincing while it is going on, which is why it gets skipped, and skipping it is the commonest reason a newly plastered room still looks blotchy after two full coats.
On old walls the same principle applies for a different reason. Wallpaper adhesive left on the wall, previous distemper, and patch repairs all take paint differently, so the wall is washed down and sealed before anything else happens.
The stain keeps coming back through the paint. What is that?
Water, tannin from timber, or nicotine, and each one needs a different answer.
- A brown-edged mark on a ceiling is a water stain. If the leak has been fixed and the plaster is dry, a stain blocker holds it back. If the leak has not been fixed, nothing holds it back.
- Yellow-brown bleed through paint on woodwork is tannin coming out of the timber, usually on knots. It needs sealing rather than another coat.
- An overall yellowing across a whole ceiling is generally nicotine or soot from an open fire, which washes and seals rather than covering.
- A white crystalline bloom on a chimney breast or an outside wall is salt carried out by moisture, and it will keep arriving while the moisture does.
So the first thing we do with a returning mark is work out which of the four it is, because painting is the last step of the fix and not the fix itself.
What is worth doing with old sash windows and external woodwork?
Repairing the failed sections, in most cases, rather than replacing whole frames.
The Victorian and Edwardian houses through New Barnet, East Barnet and the older parts of Chipping Barnet mostly still have timber sashes, and timber of that age fails in predictable places: the bottom rail, the sill, and the outer lining where rainwater sits and cannot drain. The rest of the frame is often perfectly sound under the paint.
Cutting out the decayed section and letting in new timber keeps the original window and the proportions of the elevation. Where the decay runs through the whole frame that is no longer sensible, and we will say so. That decision needs a screwdriver and somebody looking at it, which is what the free assessment is for.
Parts of Barnet sit in conservation areas – Monken Hadley and the older streets around Wood Street and Hadley Green among them – and listed buildings have their own rules. External colour, window changes and the removal of period detail can all be restricted, so it is worth checking with Barnet Council before anything is ordered.
What we take on, and what we do not
Interior painting and decorating, wallpaper hanging and stripping, woodwork and joinery finishing, staircases, doors and frames, and external painting to timber, masonry and metalwork within reach from ground-based access.
We do not carry out work that needs scaffolding to the roofline as a separate job, and we do not do roofing. We do not carry out gas work and we are not Gas Safe registered. We are not on an electrical competent person scheme and do not self-certify electrical work.
We do not sand or remove textured coatings applied before the 2000s, because they can contain asbestos and disturbing them is work for a licensed contractor.
How is decorating quoted?
By the room, by what has to happen before a brush comes out, and after somebody has seen it.
The call-out and assessment are free – you only pay for the work. No VAT is added on top. Two rooms of identical size are different jobs if one has sound walls and the other has wallpaper over distemper, so the preparation is priced separately from the painting and you can see which is which.
What you get is the rooms, the preparation each one needs, the number of coats, which surfaces are included – ceilings, walls, woodwork, radiators, doors – and what is being left out. Anything found once the paper comes off is described before it is done.
How do I book someone to come and look?
Ring and say which rooms and what state they are in. We work every day from 8am to 10pm.
Useful things to have to hand: whether the plaster is new and when it went on, whether anything is papered, whether there are marks that have come back before, and whether the house is occupied during the work. Decorating is disruptive in a different way from building work – it is quiet, but rooms are out of use.
We are based in Mill Hill, London NW7, and cover Mill Hill, Hendon, Edgware, Finchley, Barnet, Golders Green, Colindale, Burnt Oak, Stanmore, Borehamwood and Elstree.
Questions Barnet homeowners ask about decorating
How long should new plaster dry before it is painted?
Long enough to go evenly pale all over, with no darker patches left. In a heated room that is usually a few weeks rather than a few days, and thick coats over hacked-off areas take longer than a thin skim. Painting a wall that is still holding water traps it behind the film, and the paint then blisters or the wall stays patchy however many coats go on.
Why does the first coat on new plaster look so patchy?
Because bare plaster is porous and drinks the paint unevenly. The answer is a mist coat first: emulsion thinned with water so it soaks in and seals the surface rather than sitting on it. Once the mist coat is on, the full coats cover evenly. Skipping it is the single commonest reason a freshly plastered room looks blotchy after two coats.
Can you paint over a damp or stained patch so it does not come back?
Only once the cause has been dealt with. A stain blocker will hold back an old, dry mark from a leak that has been fixed. It will not hold back an active one, and painting over live damp buys a few weeks before the mark returns wider than it was. We look at where the water is coming from before anything is covered up.
Is it worth repairing old sash windows rather than replacing them?
Usually, if the frames are sound. Most decayed sash windows have failed in a few specific places – the bottom rail, the sill, the outer lining where water sits – and those sections can be cut out and new timber let in. What decides it is whether the decay is local or through the whole frame, which needs a screwdriver and somebody looking, not a photograph.
Do I need permission to change the outside colour of my house in Barnet?
Sometimes. Parts of Barnet, including Monken Hadley and the older streets around Wood Street and Hadley Green, sit in conservation areas, and listed buildings have their own rules. External colour, window changes and removing period detail can all be restricted. It is worth a check with Barnet Council before anything is ordered rather than after.
Which parts of Barnet do you cover for decorating?
Chipping Barnet, High Barnet, New Barnet, East Barnet, Whetstone and the streets around them, along with Mill Hill, Hendon, Edgware, Finchley, Golders Green, Colindale, Burnt Oak, Stanmore, Borehamwood and Elstree.
Nearby and related
Decorating is the last trade in, so it usually follows something else. If the walls are being made good first, see plastering in Barnet. If woodwork is being repaired or replaced, carpentry in Barnet. For a whole room being rebuilt, kitchen renovation and bathroom fitting, and for structural work, building work in Barnet.
If a stain keeps returning and nobody can find the source, leak detection comes before any paint.
Call us
Call 07777 759333 – we work every day from 8am to 10pm. We are based in Mill Hill, London NW7.