Digging Footings in NW4 Clay, Next Door to a Neighbour

An extension in Hendon is decided underground, before anything anyone can see gets built. NW4 sits on London Clay, most of the houses are semis or terraces with a neighbour attached, and those two facts between them set the depth of the footings, the notices you have to serve and how long the first fortnight takes.

None of that is a reason not to build. It is a reason to find it out at the survey rather than with a digger standing idle in the back garden. Fix Your House does the design and the build, so what gets discovered in the ground is redesigned by the same people who drew it.

Why do the footings go so deep here?

Because clay moves. London Clay takes up water in winter and gives it up in summer, so the ground under a shallow footing rises and falls through the year. Build on top of that shallow and the building follows the ground; go below the zone that dries out and it does not.

The depth is set by the ground and by what is growing near it, not by how big the extension is. A small rear extension next to a mature tree can need deeper foundations than a much larger one on an open plot. It is confirmed from a trial hole, designed by a structural engineer and agreed with building control before anything is poured.

There are already cracks in the back wall. Will building make them worse?

Not by itself, but they need explaining before you start rather than after. Fine stepped cracking that follows the mortar joints, opens in a dry summer and closes again in winter, is the ordinary seasonal movement of a house on clay. Cracking that is wider at the top, does not close up, or is newly through a brick rather than around it, is a different conversation.

What matters for the extension is that the new part will sit on new, deeper foundations while the old part stays on its original ones. The two will not move identically, which is why the junction between them is detailed deliberately instead of just built into.

How close can I build to next door?

Up to the boundary, in most cases. The constraint is not the distance sideways, it is the depth downwards and what that does to their foundations.

Two triggers are worth knowing before you plan anything:

  • Excavating within three metres of a neighbour’s building and going deeper than their foundations.
  • Excavating within six metres and cutting below a line taken down at forty-five degrees from the bottom of theirs.

Either one brings the work under the Party Wall etc. Act 1996, and on a Hendon semi at least one of them is nearly always met. That is true whether or not you lay a finger on the shared wall.

Do I have to tell the neighbour before we dig?

Yes, in writing, and early. Notice for excavation under the Act is one month. Cutting into the party wall itself, which is what happens when a beam needs bearing, is two months.

A neighbour can consent in writing, which ends it there, or dissent, which means surveyors are appointed and an award is drawn up before work starts. Dissent is not hostility and it is not unusual; it is simply the formal route. What causes the trouble on these streets is starting the clock late, because the notice period runs whether or not you are ready to build.

There is a drain running down the side of the house. Does that stop the extension?

It rarely stops it, but it has to be dealt with before the slab, not after. The shared drain runs serving most of these streets transferred to Thames Water in 2011, so the pipe crossing your side return is very likely theirs rather than yours.

Building over one, or within three metres of it, needs a build-over agreement. That is normally granted with conditions on protecting or diverting the run, sometimes with a new inspection chamber in an accessible position. The lead time on the agreement is the part worth starting early.

Do I need planning permission, or is it permitted development?

Many single-storey rear extensions in Hendon are permitted development, subject to limits on depth, height and materials, with a prior approval route for going deeper.

Two things are worth checking first, and both are Barnet Council questions. Whether the house is in a conservation area, and whether permitted development rights have been removed from it. Either changes the answer completely, and a flat or maisonette has no permitted development rights for an extension at all.

Who signs the work off?

Building control, and for NW4 that is the London Borough of Barnet or an approved inspector. Planning permission and building control are separate things that people routinely treat as one: planning decides whether it may be built, building control decides whether it is built properly.

The inspections that matter on an extension are almost all early – the trial hole, the excavation before concrete, the damp proof course, the drainage before it is covered. Miss one and the ground is opened again.

What actually happens in the first two weeks?

Digging, and it is the messiest and least impressive part of the job. Spoil from a clay dig comes out heavy and wet, there is far more of it than the hole suggests, and it has to leave the site down the same side return everything else comes in by.

Access decides a great deal on a Hendon semi. Where the only route is a side alley, the muck and the concrete both go through it by barrow, and that is slower than a plot with rear access. We will tell you which you have at the survey. Free call-out and assessment – you only pay for the work. No VAT is added on top.

Questions Hendon neighbours and owners ask

How deep do foundations go for an extension in Hendon?

Deeper than most people expect, because NW4 sits on London Clay and clay shrinks and swells with the seasons. The depth is set by the ground and by anything growing near it rather than by the size of the extension, and it is confirmed by a structural engineer and agreed with building control once the trial hole is open. A shallow footing on clay is what produces the stepped cracking you see on so many houses around here.

Do I need a party wall notice to dig near my neighbour?

Almost certainly, if you are excavating within three metres of their building and going deeper than its foundations, or within six metres and cutting below a line drawn down at forty-five degrees from the bottom of theirs. That is the Party Wall etc. Act 1996 and it applies to a semi or a terrace whether or not you touch the wall itself. Notice for excavation is one month; cutting into the party wall itself is two.

Can I build over a drain?

Sometimes, with an agreement rather than a hope. Since 2011 the shared drain runs in most Hendon streets belong to Thames Water, and building over or within three metres of one needs their consent before the slab goes down. It is usually granted with conditions on how the run is protected or diverted. Finding it after the foundations are poured is the expensive version.

Does a tree near the extension have to come down?

Not necessarily, and cutting it down is sometimes the worse option. On clay a mature tree has been drying the ground out for decades, and removing it lets that ground swell back, which lifts what is built on it. The safer route is usually to keep the tree and take the foundations deeper. A tree in a conservation area, or one with a preservation order, cannot be touched without the council anyway.

Do you do the design as well as the build?

Yes. One of us leads the design and the other leads the build, and we manage the trades who carry out the work. On an extension that matters most when something is found in the ground, because the person redesigning around it is the person who drew it in the first place.

Which parts of Hendon do you take on building work in?

All of it, including Hendon Central, Brent Street, Church End, West Hendon and the Shirehall side, and out to Mill Hill, Colindale, Burnt Oak, Golders Green, Edgware and Finchley. We are based in Mill Hill, London NW7.

Nearby and related

Parent page: house extensions across North West London. The same work nearby: building work in Barnet and loft conversions in Barnet, where the structural questions are about beams and down-stands rather than ground.

If the plan is a new room rather than a new footprint, that is interior design and build, and it is drawn first in 3D and BIM. Once the shell is up, the fit-out is kitchen fitting in Hendon and bathroom fitting in Hendon.

Call us

Call 07777 759333 – answered every day from 8am to 10pm. We are based in Mill Hill, London NW7.

Also see builder in Golders Green, where Hampstead Garden Suburb Trust consent can apply as well as planning permission.