Builder in Golders Green: Extensions, Lofts and the Hampstead Garden Suburb Question

Building work in Golders Green turns on one question before any drawing: which rule book does your address fall under? Part of NW11 sits inside Hampstead Garden Suburb, where a second body has to consent as well as the council, and many homes here are flats or converted houses that the usual extension rights do not cover.

Planning building work in Golders Green? Call Fix Your House on 07777 759333. Free call-out and assessment — you only pay for the work.

On this page

What does a builder do on a Golders Green house, and what is not ours to sign off?

We design and build together, with an in-house team and managed external trades, and we show the work as an in-house 3D visualisation before it is priced. What we do not do is decide permission: planning permission is Barnet’s decision, Trust consent (where it applies) is the Trust’s, and building regulations sign-off belongs to building control. We work to those decisions; we do not make them for you.

Floor protection laid across a room before work starts.
Polythene floor protection laid across a room before work starts — the first step on any building job in a house the family is still using.

Does my Golders Green home count as a house for extension rules?

For about half the households here, yes. In the 2021 Census, Golders Green ward had 5,027 households: 532 detached, 1,446 semi-detached and 418 terraced — 2,396 in all — against 1,495 in purpose-built flats and 998 in part of a converted or shared house.

That split decides what the rules can do for you. Planning Portal says the permitted-development extension rules apply to houses only, and not to flats, maisonettes or converted houses, nor to areas where an Article 4 direction removes the rights. Roughly one household in five in the ward lives in a converted or shared house, and for them the route is a planning application, not a quick check against the limits.

Private renting is the other thing to know: 2,419 of the ward’s 5,028 households rent privately or live rent free in the same Census, so a good share of building work here starts with a landlord’s decision, not an occupier’s.

Is my home inside Hampstead Garden Suburb, and what does that add?

Possibly, and it is worth finding out before a drawing is made. Barnet records that the Hampstead Garden Suburb Conservation Area was designated in 1968; it runs from East End Road in the north, takes in the land around the Heath Extension, and on the west reaches the east side of Finchley Road. Barnet also notes that the conservation area and the Trust’s Scheme of Management are not entirely the same: the Scheme covers neither the Crematorium nor most of The Bishops Avenue.

Inside the Scheme, the Trust’s planning FAQs are specific:

  • The Trust’s consent is required for any external change to a Suburb property, and it is distinct from planning permission and applied for separately.
  • The Suburb is a conservation area with an Article 4 direction, so permitted development rights are not applicable and planning permission may be needed for external alterations.
  • In freehold houses internal work does not need Trust consent, except loft and garage conversions, which the Trust says will almost always have external effects.
  • Consent comes in two stages: Provisional Consent (valid for three years) and, after an inspection when the work is finished, Final Consent. The Trust warns that a sale can be difficult without Final Consent.
  • Applications go through a committee and then the Trust Council, which each meet about every six weeks; some minor items are decided by staff under delegated powers.

The Trust does not recommend contractors and says the responsibility for choosing them rests with the homeowner. Nothing on this page is a Trust recommendation; what we can do is build to the conditions of the consent once you have it.

What changes for an extension inside a conservation area?

More than in an ordinary street. On Planning Portal’s extensions page, land of this kind is called Article 2(3) land, and there:

  • Every side extension needs householder planning permission.
  • Cladding of the exterior is not covered by permitted development.
  • The bigger single-storey rear extension limits — eight metres for a detached house, six for any other, subject to prior approval — do not apply. The ordinary limits are four metres for a detached house and three for any other.

The second Golders Green conservation area is a different kind of place. Barnet describes the Golders Green Town Centre conservation area as the shopping centre around the junction of Finchley Road, Golders Green Road and North End Road, with the railway and bus station; Barnet says about 400 of the more than 16,000 people in Golders Green live inside it, and the planning data record dates its designation to 4 March 1998. A house on a residential street outside it is not caught by that designation, but a flat above a shop on the parade may be.

Who has to be told before building starts next to a neighbour?

The adjoining owner, if the work falls under the Act. GOV.UK says the Party Wall etc Act 1996 covers new building on or at the boundary, cutting into a party wall and excavation near a neighbour’s foundations, and that the notice goes from the building owner to the adjoining owner. With 1,446 semi-detached and 418 terraced households in the ward, a shared wall is a normal part of the brief here.

Notices are separate from planning permission, Trust consent and building regulations. One does not stand in for another.

How do we show the work before you commit?

An in-house 3D visualisation lets you see the extension against the house before a structural item is priced, and gives the Trust or the council something concrete to respond to. The written price is fixed before any work starts, no VAT is added on top, and there is no out-of-hours surcharge for evenings, weekends or bank holidays.

Golders Green building questions

Do I need planning permission for an extension in a conservation area?

Often yes, and more often than elsewhere. On Article 2(3) land, which includes conservation areas, every side extension needs householder planning permission, exterior cladding is not allowed under permitted development, and the larger rear-extension limits that need prior approval are not available. Check your address with Barnet before drawings are made.

Do I need a party wall agreement for an extension?

Only if the work falls under the Party Wall etc Act 1996: building on or at the boundary, cutting into a party wall, or digging below the foundations of a neighbouring building. If it does, the adjoining owner has to be given notice before work starts. The Act is separate from planning permission and building regulations.

Do I need Hampstead Garden Suburb Trust consent as well as planning permission?

Yes, if your home is under the Trust’s Scheme of Management. The Trust says its consent is needed for any external change, is distinct from planning permission, and must be applied for separately. The Trust and Barnet each decide their own application.

How long does a house extension take?

The consents usually set the pace before any building starts. The Trust says its Council meets about every six weeks and applications must be in several weeks ahead, and Barnet runs its own timetable. Once the scope is settled we give the programme in writing alongside the fixed written price.

Nearby and related

More on this service: house extensions across North West London. Also in Golders Green: handyman in Golders Green, blocked drains in Golders Green and leak detection in Golders Green. Builders nearby: Hendon and Barnet.

Call us

Call 07777 759333 — we work every day from 8am to 10pm. We are based in Mill Hill, London NW7.